TENESO
 
Integrated Logistics
Refurbishment, Configurations and Customisations, Equipments
 

MITSafetrans is not only goods handling: inside its warehouses it arranged Staging Areas, Technical Laboratories where the Customer or MITSafetrans’ technicians can carry out Pre-installations, Refurbishment, Configurations and Customisations, Equipment preparation (Equipment components, SW loading, Electrical connections, Final Tests).
MITSafetrans professional skills and competence offers to companies the possibility to outsource many of their activities thus entrusting a partner able to ensure a high level logistic service, with strong specialisation, and perfectly able to manage the whole customer's supply chain.

The preliminary step of As ls analysis, shared validation of the best To Be solution and Startup project is fully managed by a dedicated engineering team.

The project step is always implemented in order to ensure cost savings and an implementation of processes, and it is applied to the following guidelines:

- As Is analisys
definition of the analysis frame, data identification, analysis of timing/methods and study of the integrated process, outline and validation of the financial orientation to evitable costs

- Improvement definition
Identification of criticalities and improvement points, application of models with constraints and parameters highlighted

- Taylor made solution
validation of the pattern to aim to and of implementation steps, sharing of solutions

- Project implementation
planning of time schedules and activities, definition of resources, procedures, outline of support to operational startup.

MITSafetrans offers an efficient integrated logistics, with one operator only dealing with the whole supply chain, and which offers the Customer the following advantages:

  • Management of one highly specialised supplier only
  • Higher safety of the product (handling minimised)
  • One integrated information system for transports and logistics (online order tracing, online display of stocks per product or family, e-POD signed by the assignee after delivery).